To answer your second question, I would say inductive reasoning; three heads 
don't cover enough area to have a high enough occupant load for a bar to have 
enough patrons to start a bar fight!  Simple. 
Mark at Aero

----- Original Message -----
From: Vince Sabolik [mailto:[email protected]]
Sent: Sunday, January 20, 2013 06:57 PM
To: [email protected] <[email protected]>
Subject: Re: First this, THEN football

Bruce,

Thanks. My intent is to leave 3 hsw's (regular QR sidewalls) on the 
prime coated
drywall and call it a day. If the tenant has a flat ceiling, it's 
covered no matter what.

All cpvc will be in a wall or over a ceiling. The sidewall heads will 
be supplied by cpvc armovers
into the wall.

My question was one of supplying these commerical heads with cpvc.

IF this has to be supplied from one pipe (say because they want a 
flow switch), I was wondering
if it will need to be copper in the wall instead of cpvc?

Java? How'd you know it's not a bar?




At 01:43 PM 1/20/2013, you wrote:
>The pipe is protected per it's listing?
>
>Or is your question that C of O for building will done before java spot is
>built out?
>
>
>Vince Sabolik, West Tech Fire Protection, Inc.
11351 Pearl Road / Strongsville, Ohio 44136       440 
238-4800     Fax 440 238-4876
____________________________________________________________________


-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20130120/73d9573f/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum


_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to