To answer your second question, I would say inductive reasoning; three heads don't cover enough area to have a high enough occupant load for a bar to have enough patrons to start a bar fight! Simple. Mark at Aero
----- Original Message ----- From: Vince Sabolik [mailto:[email protected]] Sent: Sunday, January 20, 2013 06:57 PM To: [email protected] <[email protected]> Subject: Re: First this, THEN football Bruce, Thanks. My intent is to leave 3 hsw's (regular QR sidewalls) on the prime coated drywall and call it a day. If the tenant has a flat ceiling, it's covered no matter what. All cpvc will be in a wall or over a ceiling. The sidewall heads will be supplied by cpvc armovers into the wall. My question was one of supplying these commerical heads with cpvc. IF this has to be supplied from one pipe (say because they want a flow switch), I was wondering if it will need to be copper in the wall instead of cpvc? Java? How'd you know it's not a bar? At 01:43 PM 1/20/2013, you wrote: >The pipe is protected per it's listing? > >Or is your question that C of O for building will done before java spot is >built out? > > >Vince Sabolik, West Tech Fire Protection, Inc. 11351 Pearl Road / Strongsville, Ohio 44136 440 238-4800 Fax 440 238-4876 ____________________________________________________________________ -------------- next part -------------- An HTML attachment was scrubbed... URL: <http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20130120/73d9573f/attachment.html> _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum
