I'm from Pugetopolis.  We always assume coffee unless proven otherwise.bv

-----Original message-----
From: Vince Sabolik <[email protected]>
To: [email protected]
Sent: Sun, Jan 20, 2013 18:57:13 GMT+00:00
Subject: Re: First this, THEN football

Bruce,

Thanks. My intent is to leave 3 hsw's (regular QR sidewalls) on the prime coated drywall and call it a day. If the tenant has a flat ceiling, it's covered no matter what.

All cpvc will be in a wall or over a ceiling. The sidewall heads will be supplied by cpvc armovers
into the wall.

My question was one of supplying these commerical heads with cpvc.

IF this has to be supplied from one pipe (say because they want a flow switch), I was wondering
if it will need to be copper in the wall instead of cpvc?

Java? How'd you know it's not a bar?




At 01:43 PM 1/20/2013, you wrote:
The pipe is protected per it's listing?

Or is your question that C of O for building will done before java spot is
built out?


Vince Sabolik, West Tech Fire Protection, Inc.
11351 Pearl Road / Strongsville, Ohio 44136 440 238-4800 Fax 440 238-4876
____________________________________________________________________


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments /20130120/73d9573f/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20130120/5a6d3694/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to