Hell! I only meant to ask one question!
Now, I'm done for the year?


At 02:08 PM 1/20/2013, you wrote:
To answer your second question, I would say inductive reasoning; three heads don't cover enough area to have a high enough occupant load for a bar to have enough patrons to start a bar fight! Simple.
Mark at Aero

----- Original Message -----
From: Vince Sabolik [mailto:[email protected]]
Sent: Sunday, January 20, 2013 06:57 PM
To: [email protected] <[email protected]>
Subject: Re: First this, THEN football

Bruce,

Thanks. My intent is to leave 3 hsw's (regular QR sidewalls) on the
prime coated
drywall and call it a day. If the tenant has a flat ceiling, it's
covered no matter what.

All cpvc will be in a wall or over a ceiling. The sidewall heads will
be supplied by cpvc armovers
into the wall.

My question was one of supplying these commerical heads with cpvc.

IF this has to be supplied from one pipe (say because they want a
flow switch), I was wondering
if it will need to be copper in the wall instead of cpvc?

Java? How'd you know it's not a bar?



Vince Sabolik, West Tech Fire Protection, Inc.
11351 Pearl Road / Strongsville, Ohio 44136 440 238-4800 Fax 440 238-4876
____________________________________________________________________


-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20130120/6f215ad9/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to