Yeah, old. I thought that there was an extra hazard schedule that I referenced once for a remod that included 3/4 pipe and had reduced large sizes. Apparantly not too many online that did work in the old testament!
----- Reply message ----- From: "Mike Cabral" <[email protected]> To: "[email protected]" <[email protected]> Subject: Pipe Schedule including ¾" Date: Wed, Dec 31, 2014 2:05 PM That's an old one. 3/4 - one head 1"- two heads 1-1/4"- 3 heads 1-1/2"-5 heads 2"- 7 heads. From memory. In the old textile mills in New England FM had a program where the 3/4" was replaced with 1". Removed the 1x3/4x1/2 tee replaced it with 1x1x1/2 and replaced the 3/4" length of pipe keeping the same spacing. Did thousands of them in the 70's. Mike C Sent from my iPhone > On Dec 31, 2014, at 12:10 PM, Vince Sabolik <[email protected]> wrote: > > Hi Forum (and Happy New Year!) > > Does anyone have a pipe schedule that ends > with ¾" pipe, and includes all the big pipe? > > Sure would appreciate it! > > > West Tech Fire Protection, Inc. > 11351 Pearl Road > Suite 102 > Strongsville, Ohio 44136 > T 440 238-4800 F 440 238-4876 > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
