The main is the 1st floor. Seating is around the tanks. 900sqft for tanks
Basement is processing and production Get Outlook for iOS<https://aka.ms/o0ukef> ________________________________ From: Sprinklerforum <sprinklerforum-boun...@lists.firesprinkler.org> on behalf of Prahl, Craig/GVL <craig.pr...@ch2m.com> Sent: Thursday, March 29, 2018 1:11:34 PM To: sprinklerforum@lists.firesprinkler.org Subject: RE: Vertical Opening [EXTERNAL] [EXTERNAL] [EXTERNAL] Is the 900 sq. ft. opening to accommodate the height of the tanks. The tanks and their associated piping and controls are visible on the same level as the seating around the tanks? Is 1st flr and main level the same level or is it basement, 1st level with seating and main level above 1st for restaurant? Craig Prahl | JACOBS | Fire Protection | Greenville SC | 864.676.5252 | craig.pr...@ch2m.com<mailto:craig.pr...@ch2m.com> | www.jacobs.com<http://www.jacobs.com/> From: Sprinklerforum [mailto:sprinklerforum-boun...@lists.firesprinkler.org] On Behalf Of JD Gamble Sent: Thursday, March 29, 2018 3:06 PM To: sprinklerforum@lists.firesprinkler.org Subject: Re: Vertical Opening [EXTERNAL] [EXTERNAL] [EXTERNAL] Yes. F-1 in the basement with a through floor opening for the tanks. Seating on the 1st around the tanks. Main level is restaurant with restaurant seating. Get Outlook for iOS<https://aka.ms/o0ukef> ________________________________ From: Sprinklerforum <sprinklerforum-boun...@lists.firesprinkler.org<mailto:sprinklerforum-boun...@lists.firesprinkler.org>> on behalf of Prahl, Craig/GVL <craig.pr...@ch2m.com<mailto:craig.pr...@ch2m.com>> Sent: Thursday, March 29, 2018 12:25:52 PM To: sprinklerforum@lists.firesprinkler.org<mailto:sprinklerforum@lists.firesprinkler.org> Subject: RE: Vertical Opening [EXTERNAL] [EXTERNAL] So, is the A occupancy on the first floor and F-1 is the second floor? Is there seating on the first level and the opening is so you can see the equipment on the second floor? Per the IBC, for a fully sprinklered building there is a 1-hour fire separation requirement between F-1 and A. (Table 508.4) If that is the case, someone has a problem that sprinklers cannot fix. Craig Prahl | JACOBS | Fire Protection | Greenville SC | 864.676.5252 | craig.pr...@ch2m.com<mailto:craig.pr...@ch2m.com> | www.jacobs.com<http://www.jacobs.com/> From: Sprinklerforum [mailto:sprinklerforum-boun...@lists.firesprinkler.org] On Behalf Of JD Gamble Sent: Thursday, March 29, 2018 1:55 PM To: sprinklerforum@lists.firesprinkler.org<mailto:sprinklerforum@lists.firesprinkler.org>; sprinklerforum@lists.firesprinkler.org<mailto:sprinklerforum@lists.firesprinkler.org> Subject: Re: Vertical Opening [EXTERNAL] [EXTERNAL] Restaurant/ Brewery No ratings, Something about F1 to A not requiring separation Light hazard seating ordinary in the brew area. Get Outlook for iOS<https://aka.ms/o0ukef> ________________________________ From: Sprinklerforum <sprinklerforum-boun...@lists.firesprinkler.org<mailto:sprinklerforum-boun...@lists.firesprinkler.org>> on behalf of Prahl, Craig/GVL <craig.pr...@ch2m.com<mailto:craig.pr...@ch2m.com>> Sent: Thursday, March 29, 2018 11:52:01 AM To: sprinklerforum@lists.firesprinkler.org<mailto:sprinklerforum@lists.firesprinkler.org> Subject: RE: Vertical Opening [EXTERNAL] Is this like an atrium? What's the occupancy? Any fire rating of floor/ceiling between levels? Craig Prahl | JACOBS | Fire Protection | Greenville SC | 864.676.5252 | craig.pr...@ch2m.com<mailto:craig.pr...@ch2m.com> | www.jacobs.com<http://www.jacobs.com> Quoting JD Gamble <jgam...@lssofsheridan.com<mailto:jgam...@lssofsheridan.com>>: > I have a situation where we have 900sq.ft. vertical opening > communicating between two floors where a draft stop is not a viable > solution due to head room clearance. The design team isn't sure if or > how to protect it? Thoughts? Options? > > It's a Light Hazard - Ord Hazard occ. The idea of "Barn Door" style > sliding doors is being proposed but my fear is these things being left > open in a fire situation. > > I thought there was some direction in the 101 about communicating > spaces, but not sure. We do not recognize the 101 at the AHL level > but I think I could offer it as guidance . > > Life Safety Solutions of Sheridan > > JD Gamble > jgam...@lssofsheridan.com<mailto:jgam...@lssofsheridan.com<mailto:jgam...@lssofsheridan.com%3cmailto:jgam...@lssofsheridan.com>> > (307) 763-3361 _______________________________________________ Sprinklerforum mailing list Sprinklerforum@lists.firesprinkler.org<mailto:Sprinklerforum@lists.firesprinkler.org> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org ________________________________________________________________________________________ NOTICE - This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer. _______________________________________________ Sprinklerforum mailing list Sprinklerforum@lists.firesprinkler.org<mailto:Sprinklerforum@lists.firesprinkler.org> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________ Sprinklerforum mailing list Sprinklerforum@lists.firesprinkler.org http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org