There's a chase between (2) bathrooms that has an access door which I assume is for maintenance. The drywall stops 6" above ceiling, basically making the entire structure above the ceiling "open". I can't imagine we would need to provide protection at the deck throughout the whole area. Seems like I remember something about only needing to protect the deck within a given area?
Brian Harris, CET BVS Systems Inc. bvssytemsinc.com _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
