There's a chase between (2) bathrooms that has an access door which I assume is 
for maintenance. The drywall stops 6" above ceiling, basically making the 
entire structure above the ceiling "open". I can't imagine we would need to 
provide protection at the deck throughout the whole area. Seems like I remember 
something about only needing to protect the deck within a given area?

Brian Harris, CET
BVS Systems Inc.
bvssytemsinc.com
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to