TECHNICAL UPDATE

July 8, 2009

---------------------



TECHNICAL UPDATE & TECH TALK INDEX January - June 2009



-----------------------

Issue: Technical Update January 9, 2009

Topic: Fire Pump Minimum Suction Pressure

Standard: 20

-----------------------

Issue: Technical Update January 16, 2009

Topic QR Reduction for Single Interlock Preaction System

Standard: 13

-----------------------

Issue: Technical Update January 23, 2009

Topic: Strain Relief for Underground Pipe

Standard: 20

-----------------------

Issue:   Tech Talk

Topics   Comments Due March 6th for the Report on Proposals; 5- 
Yr.Internal

          Inspections for NFPA 13RCPVCPipe Required by NFPA 25?

-----------------------

Issue: Technical Update February 4, 2009

Topic NFPA 13R Attic Design Density

Standard: 13R

-----------------------

Issue: Technical Update February 12, 2009

Topic Visual Inspection of Sprinklers

Standard: 25

-----------------------

Issue: Technical Update February 18, 2009

Topic: 1.2 Leg of Remote Area

Standard 13

-----------------------

Issue: TechTalk February 2009

Topic: Report On Comments for NFPA 13/13R/13D, 20 and 24; NFPA issues  
a New Report on Sprinklers; Wardrobe Units and Cabinets

-----------------------

Issue: Technical Update March 6, 2009

Topic: Inspection of Sprinklers

Standard 25

-----------------------

Issue: Technical Update March 26, 2009

Topic: Pipe Replacement

Standard: 13

-----------------------

Issue: Technical Update April 1, 2009

Topic: Adequate Drain Size

Standard: 13

-----------------------

Issue: Technical Update April16, 2009

Topic: Proscenium Opening Protection

Standard: 13

-----------------------

Issue: Technical Update April 29, 2009

Topic: Remote Area Size

Standard: 13

-----------------------

Issue:     TechTalk April 2009

Topics:    Retail Classification; Updating the Standards

-----------------------

Issue: Technical Update May 21, 2009

Topic: Inspectors Test Connection

Standard: 13

-----------------------

Issue: TechTalk May 2009

Topic:     Updated Informal Interpretation Request Form

-----------------------

Issue: Technical Update June 10, 2009

Topic: Water flow for an Auxiliary Dry System

Standard: 13

-----------------------

Issue: Technical Update June 17, 2009

Topic: Shadow Area

Standard: 13

-----------------------

Issue: Technical Update June 25, 2009

Topic: 5-Year Flow Test

Standard: 25

-----------------------

Issue: Technical Update July 1, 2009

Topic: Technical Update & Tech Talk Index (January - June 2009)

-----------------------



Technical Update is prepared by the Technical Services Dept. of the  
AFSA: Vice President of Engineering and Technical Services Roland  
Huggins, a PE registered in fire protection engineering; Phill Brown,  
a NICET IV certified automatic sprinkler technician and NFPA Certified  
Fire Protection Specialist (CFPS) and Tom Wellen, a degreed fire  
protection engineering technologist.  This is provided with the  
understanding that the AFSA assumes no liability for this opinion or  
actions taken on it and they are not to be considered the official  
position of the NFPA or its technical committees.





Copyright (c) 2009, American Fire Sprinkler Association.  All Rights  
Reserved

--------------------------

If you'd rather not receive future faxes from AFSA, fax your removal  
request to Amy Sweeney at Efax (214) 242-3155 or call toll free (888)  
839-4830 or send e-mail request @ [email protected].   Please  
include your company name and the specific fax numbers(s) at which you  
do not wish to receive faxes from us.  Our failure to comply with your  
request may be unlawful.

  