On 10/19/2010 11:02 AM, Anthony wrote:
On Tue, Oct 19, 2010 at 11:56 AM, Nathan Edgars II<[email protected]> wrote:
We do have highway=proposed/construction.
Most of which I assume would be usable for travel, at least by
construction vehicles. If highway=proposed is being used for
something which is completely invisible, I think that's inappropriate.
How so? highway=proposed sounds like the very definition of a “paper
street”. Until construction has been started (highway=construction)
there will be no physical evidence of it.
Whether or not we’re interested in documenting what’s not on the ground
is an entirely different question, but if we’re going to map
proposed/paper streets at all, highway=proposed sounds entirely appropriate.
Of course, at some point a proposal may die and there’s no need to
indicate on the map where a road is *no longer* proposed.
—Alex Mauer “hawke”
_______________________________________________
Tagging mailing list
[email protected]
http://lists.openstreetmap.org/listinfo/tagging