Hi The polls ran for less than a day before they drew considerable fire for using too much bandwidth. Since we still had several steps to go (what to design, what to design it with, and who to design what), it was dropped. Doing a group general purpose FPGA based timing board isn't going to happen within the perceived bandwidth limits here.
Bob -----Original Message----- From: [email protected] [mailto:[email protected]] On Behalf Of Tijd Dingen Sent: Saturday, May 14, 2011 5:04 PM To: [email protected] Subject: [time-nuts] Results parts selection + commercial assembly poll? Incidentally, did something ever come of these two polls? I was trying find the conclusion / results, but could not find it on the list. Entirely possible that I am blind for which I apologize in advance. Anyone know what came of it? regards, Fred _______________________________________________ time-nuts mailing list -- [email protected] To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/time-nuts and follow the instructions there. _______________________________________________ time-nuts mailing list -- [email protected] To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/time-nuts and follow the instructions there.
