On 12/29/2011 12:57 PM, Joseph P Villa wrote:
> The system has 8 cores and 16GB of memory. I'm doubting that the system is 
> the problem. :-) 
>
> It is running 4 Trac projects at the same time. The database is probably 
> around 200MB at most. Each project has it's own database. 

What do you do for storage? And db backend?

-- 
Dimitri Maziuk
Programmer/sysadmin
BioMagResBank, UW-Madison -- http://www.bmrb.wisc.edu

Attachment: signature.asc
Description: OpenPGP digital signature

Reply via email to