On 12/29/2011 12:57 PM, Joseph P Villa wrote: > The system has 8 cores and 16GB of memory. I'm doubting that the system is > the problem. :-) > > It is running 4 Trac projects at the same time. The database is probably > around 200MB at most. Each project has it's own database.
What do you do for storage? And db backend? -- Dimitri Maziuk Programmer/sysadmin BioMagResBank, UW-Madison -- http://www.bmrb.wisc.edu
signature.asc
Description: OpenPGP digital signature
