Hi, I was reviewing the demo version, and i noticed that it has the association, the task with the cost,(that I was looking for in my last mail), but now I have this message error.
I suppose it has in testing yet, or something I configure wrong? De: Miguel Castellanos [mailto:[email protected]] Enviado el: Jueves, 10 de Diciembre de 2009 04:23 p.m. Para: '[email protected]' Asunto: Manufacturing COST of rounting Task Hi, My question is in the module of Manufacturing I already create a Production Run(JobShop), based in Bill Of Materials and Routing Task, I have no problems with the materials and with the time estimated in the task My problem is in the Routing Task, I cannot find the way to associated the cost with the task, my problems is to charge de cost of the resourse(like Machine or labour) to the Father Product. I tried with Fixed Asset that is the option that display in the Routing Task. But it dosent charged that cost to the father product Miguel Castellanos Consultor TI | Sinergium S.A.C |www.sinergium.net | [email protected] <mailto:[email protected]>
