Please verify if the fromDate of the ProductAssoc records that represent the components of PADRE are before the date 2009-12-04:06:21:0
Jacopo On Dec 14, 2009, at 10:55 PM, Miguel Castellanos wrote: > It doesnt show my attach. > > The error message its when I creat the production run. > > The Following error occurred: > > No production run is required for product id [PADRE] in date > [2009-12-04:06:21:0], please verify the validity dates > > Of the bill of materials and routing. > > > > De: Miguel Castellanos [mailto:[email protected]] > Enviado el: Lunes, 14 de Diciembre de 2009 04:33 p.m. > Para: '[email protected]' > Asunto: RV: Manufacturing COST of rounting Task > > > > Hi, > > I was reviewing the demo version, and i noticed that it has the association, > the task with the cost,(that I was looking for in my last mail), but now I > have this message error. > > I suppose it has in testing yet, or something I configure wrong? > > > > De: Miguel Castellanos [mailto:[email protected]] > Enviado el: Jueves, 10 de Diciembre de 2009 04:23 p.m. > Para: '[email protected]' > Asunto: Manufacturing COST of rounting Task > > > > Hi, > > My question is in the module of Manufacturing > > > > I already create a Production Run(JobShop), based in Bill Of Materials and > Routing Task, > > I have no problems with the materials and with the time estimated in the > task > > My problem is in the Routing Task, I cannot find the way to associated the > cost with the task, my problems is to charge de cost of the resourse(like > Machine or labour) to the Father Product. > > I tried with Fixed Asset that is the option that display in the Routing > Task. But it dosent charged that cost to the father product > > > > > > Miguel Castellanos > > Consultor TI | Sinergium S.A.C |www.sinergium.net | > [email protected] <mailto:[email protected]> > > >
