Please verify if the fromDate of the ProductAssoc records that represent the 
components of PADRE are before the date 2009-12-04:06:21:0

Jacopo

On Dec 14, 2009, at 10:55 PM, Miguel Castellanos wrote:

> It doesnt show my attach.
> 
> The error message its when I creat the production run.
> 
> The Following error occurred:
> 
> No production run is required for product id [PADRE] in date
> [2009-12-04:06:21:0], please verify the validity dates
> 
> Of the bill of materials and routing.
> 
> 
> 
> De: Miguel Castellanos [mailto:[email protected]] 
> Enviado el: Lunes, 14 de Diciembre de 2009 04:33 p.m.
> Para: '[email protected]'
> Asunto: RV: Manufacturing COST of rounting Task
> 
> 
> 
> Hi,
> 
> I was reviewing the demo version, and i noticed that it has the association,
> the task with the cost,(that I was looking for in my last mail), but now I
> have this message error.
> 
> I suppose it has in testing yet, or something I configure wrong?
> 
> 
> 
> De: Miguel Castellanos [mailto:[email protected]] 
> Enviado el: Jueves, 10 de Diciembre de 2009 04:23 p.m.
> Para: '[email protected]'
> Asunto: Manufacturing COST of rounting Task
> 
> 
> 
> Hi,
> 
> My question is in the module of Manufacturing
> 
> 
> 
> I already create a Production Run(JobShop), based in Bill Of Materials and
> Routing Task,
> 
> I have no problems with the materials and with the time estimated in the
> task
> 
> My problem is in the Routing Task, I cannot find the way to associated the
> cost with the task,  my problems is to charge de cost of the resourse(like
> Machine or labour) to the Father Product.
> 
> I tried with Fixed Asset that is the option that display in the Routing
> Task. But it dosent charged that cost to the father product
> 
> 
> 
> 
> 
> Miguel Castellanos
> 
> Consultor TI | Sinergium S.A.C |www.sinergium.net |
> [email protected] <mailto:[email protected]> 
> 
> 
> 

Reply via email to