It doesnt show my attach.

The error message its when I creat the production run.

The Following error occurred:

No production run is required for product id [PADRE] in date
[2009-12-04:06:21:0], please verify the validity dates

Of the bill of materials and routing.

 

De: Miguel Castellanos [mailto:[email protected]] 
Enviado el: Lunes, 14 de Diciembre de 2009 04:33 p.m.
Para: '[email protected]'
Asunto: RV: Manufacturing COST of rounting Task

 

Hi,

I was reviewing the demo version, and i noticed that it has the association,
the task with the cost,(that I was looking for in my last mail), but now I
have this message error.

I suppose it has in testing yet, or something I configure wrong?

 

De: Miguel Castellanos [mailto:[email protected]] 
Enviado el: Jueves, 10 de Diciembre de 2009 04:23 p.m.
Para: '[email protected]'
Asunto: Manufacturing COST of rounting Task

 

Hi,

My question is in the module of Manufacturing

 

I already create a Production Run(JobShop), based in Bill Of Materials and
Routing Task,

I have no problems with the materials and with the time estimated in the
task

My problem is in the Routing Task, I cannot find the way to associated the
cost with the task,  my problems is to charge de cost of the resourse(like
Machine or labour) to the Father Product.

I tried with Fixed Asset that is the option that display in the Routing
Task. But it dosent charged that cost to the father product

 

 