When I run a production run routing for a product with BOM levels greater than 1, the lower level materials are not listed in the Materials List screenlet. Are separate routing required for each BOM level?

For example, with BOM
    part_1
        part_1_1
            rawpart_1_1
        part_1_2
            rawpart_1_2

I created a Routing called part_1 to which part_1 is linked as the product. When I create a production run, only part_1_1 and part_1_2 are listed as materials. Shouldn't rawpart_1_1 and rawpart_1_2 be listed in the materials list also? I even linked routing tasks to the BOMs but it didn't pull in the additional materials.

Reply via email to