Christian,

To be correct: you don't need to do the 'dependent' production runs. That
is a choice.

But yes, if you have specific tasks for the production of your sub-products
you would be better of with specific production schemas. Otherwise, the
'default' schema will be used.

Pierre Smits

*ORRTIZ.COM <http://www.orrtiz.com>*
Services & Solutions for Cloud-
Based Manufacturing, Professional
Services and Retail & Trade
http://www.orrtiz.com


On Tue, Jan 21, 2014 at 2:16 PM, Christian Carlow <
[email protected]> wrote:

> Thanks Pierre,
>
> To clarify, you're saying that the sub-products need their own separate
> routing as well and using "dependent production run" will include those
> sub-product routings?
>
>
> On 01/21/2014 03:06 AM, Pierre Smits wrote:
>
>> Hi Christian,
>>
>> That is correct. If the end product consist of parts (sub products) that
>> you produce also, you also need to have a bom and a production schema
>> (with
>> tasks and product association) for sub products.
>>
>> When creating a production run for the end product, you can automatically
>> create the production runs for the sub products by setting the 'dependent
>> production run' flag in the production run for the end product.
>>
>> Regards,
>>
>> Pierre Smits
>>
>> *ORRTIZ.COM <http://www.orrtiz.com>*
>>
>> Services & Solutions for Cloud-
>> Based Manufacturing, Professional
>> Services and Retail & Trade
>> http://www.orrtiz.com
>>
>>
>> On Tue, Jan 21, 2014 at 1:17 AM, Christian Carlow <
>> [email protected]> wrote:
>>
>>  When I run a production run routing for a product with BOM levels greater
>>> than 1, the lower level materials are not listed in the Materials List
>>> screenlet.  Are separate routing required for each BOM level?
>>>
>>> For example, with BOM
>>>      part_1
>>>          part_1_1
>>>              rawpart_1_1
>>>          part_1_2
>>>              rawpart_1_2
>>>
>>> I created a Routing called part_1 to which part_1 is linked as the
>>> product.  When I create a production run, only part_1_1 and part_1_2 are
>>> listed as materials.  Shouldn't rawpart_1_1 and rawpart_1_2 be listed in
>>> the materials list also?  I even linked routing tasks to the BOMs but it
>>> didn't pull in the additional materials.
>>>
>>>
>