Peter Gluck <[email protected]> wrote:

I told tyht what yoiu said- re cheating with flowmeters is totally false
> and imoral.
>

It is not false at all. It is true, and there is physical proof of that, in
the stains in the pipe and elsewhere.



> Youi have shown that the flowmeter used by Rossi can have some error if
> working a bit under the minimum flow not that he made frsud. I hope you
> will abandon this moronism with pipes half full.
>

For crying out loud! Half-empty pipes are common. Any plumber knows how to
make a pipe half empty. There is nothing "moronic" about it. It was obvious
to all observers this pipe was half empty. It had to be, given its position
in the setup. The rust stains in the pipe confirmed this, as did additional
testing.


As regarding Defkalion, they wanted to speak with you but then they were
> informed that you are working for a group interested in their IP aand have
> told ou to not come. From here your hatred.
>

I have nothing to do with Defkalion or the crimes they committed. They lied
to you. I was not working with any such group. The only reason I hate them
is because they defrauded DE. They did nothing to me, other than stiffing
me for $1,200.


As regarding the Gambearle report it is about error not fraud.
>

Don't be ridiculous. Read the report:

. . . DGT did not allow DE to use such measurement in any of the tests of
their technology. As a further improvement we added a second flowmeter
upstream of the water system in order to verify the behavior of the main
flowmeter during the measurement of the excess power but also in this case
the added flowmeter was readily removed by the DGT technicians forbidding
us to make any verification.

- In no case has DGT enabled DE engineers to attend the assembly phase of
the active components in the reaction chamber of the reactor R5 (built by
us according to the DGT diagrams) nor left the reactor R5 complete with all
the necessary elements for running the experiment in the DE laboratories
without their physical presence.

The total lack of cooperation from the part of DGT regarding both the
technical information and crosschecks have made it necessary to carry out
independent verification tests of the calorimetric measurements of excess
power, especially to protect clients who were about to sign trade
agreements and pay fees for the access to the DGT technology.


We were not able to make a direct measurement of the pressure fluctuations
in the hydraulic circuit because we were not allowed by DGT to make any
change in the hydraulic system . . .

DE has not been put in a position to carry out independent tests on the
technology outside of a strict protocol defined by DGT and all the tests
that DE has witnessed, even in its laboratories, have always been performed
entirely by technicians from DGT (HJ and AS). During the periods when the
DGT staff was not present at the DE site some component considered
essential for obtaining the reaction was removed in order to prevent DE
from making independent tests. . . ."


http://lenr-canr.org/acrobat/GamberaleLfinaltechn.pdf

That is not a mistake. That's fraud. DE put themselves out of business, and
DGT vanished.



> You say you worked with flowmeters, can you mimick the logical results
> from the 9 hours yest at ICCF-18 working with two simple valves and a
> flowmeter? Can you attain controllable reverse flaw?
>

Gamberale's report proves that is what they did. They never denied it. They
vanished, instead. That's what frauds do when someone catches them.

- Jed

Reply via email to