I have done a blink comparison. The 2 images were not taken from exactly
the same spot. I have tried to apply corrections.
https://picasaweb.google.com/100758632386227249211/January192012?authuser=0&feat=directlink
Apparently it is the same E-Cat BBB as from 28 Oct 2011. Look at the
orientation of the white labels on the 3 red bottles. They are identical
as are the angles of the pipes connecting them to the Fat E-Cat modules.
It is difficult to believe the Red bottles would have been screwed on
and fixed to their receptors at exactly the same rotation angle, so the
white labels are in exactly the same orientation in the 2 images.
Likewise for the vertical pipes. They are in the same relative alignment
and angle to each other on 12 Jan 2012 and 28 Oct 2011.
From those video based images I have assumed the 28 Oct 2011 BBB and
the 12 Jan 2012 BBB is the same BBB.
The position appears to be virtually the same judging from the front
edge of the left forward fork lift lifting hole versus the painted to
unpainted floor line where it crosses the bottom of the BBB and from the
alignment of the left rear upper corner of the BBB versus the frame work
on the upper wall of the building. If anything the Jan BBB may be
slightly closer to the door.
There has been work done inside the unit.
AG
On 19/01/2012 5:17 AM, Akira Shirakawa wrote:
Hello group,
Have a look at this interesting Youtube video by ecat.com:
http://www.youtube.com/watch?v=odkfAjqA4pc
Apparently it's been filmed on January 12th. It shows that:
- Rossi is currently in Bologna
- Rossi's test site appears to be cold
- The 1 MW E-Cat container shown during the last "public" demo is in
Bologna too
- There appears to be a new control box.
Have I missed anything else?
Cheers,
S.A.