Greetings,
Long time reader, first time poster... Using WUG 7.03. Wondering if there's a way to have maps stagger their polling when you launch WUG. For example, when I load the program now, all 45 of my maps load, and they're all set to poll at the same time. I'd like it so that they don't all poll at the same time, some of them are set to poll 10 seconds later, other 20 seconds later, etc. I can obviously go to individual maps and start the polling cycle over on a particular map manually, however, when I configure the system to run as a service, this will not be an available option, as a system restart will cause all polling to start at the same time again. I could also set the polling timers to be different on different maps (every 90 seconds, 100 seconds, 110 seconds, and so on) but then you lose your polling standards for reporting. Any suggestions? David Jones - CCNA Network Specialist Premier Systems, Inc 800.268.1884 x7918 515.226.7918 [EMAIL PROTECTED] Please visit http://www.ipswitch.com/support/mailing-lists.html to be removed from this list. An Archive of this list is available at: http://www.mail-archive.com/whatsup_forum%40list.ipswitch.com/
