[ https://issues.apache.org/jira/browse/YARN-3222?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14343106#comment-14343106 ]
Hadoop QA commented on YARN-3222: --------------------------------- {color:red}-1 overall{color}. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12701861/0003-YARN-3222.patch against trunk revision ca1c00b. {color:green}+1 @author{color}. The patch does not contain any @author tags. {color:green}+1 tests included{color}. The patch appears to include 2 new or modified test files. {color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings. {color:green}+1 javadoc{color}. There were no new javadoc warning messages. {color:green}+1 eclipse:eclipse{color}. The patch built with eclipse:eclipse. {color:red}-1 findbugs{color}. The patch appears to introduce 5 new Findbugs (version 2.0.3) warnings. {color:green}+1 release audit{color}. The applied patch does not increase the total number of release audit warnings. {color:green}+1 core tests{color}. The patch passed unit tests in hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager. Test results: https://builds.apache.org/job/PreCommit-YARN-Build/6800//testReport/ Findbugs warnings: https://builds.apache.org/job/PreCommit-YARN-Build/6800//artifact/patchprocess/newPatchFindbugsWarningshadoop-yarn-server-resourcemanager.html Console output: https://builds.apache.org/job/PreCommit-YARN-Build/6800//console This message is automatically generated. > RMNodeImpl#ReconnectNodeTransition should send scheduler events in sequential > order > ----------------------------------------------------------------------------------- > > Key: YARN-3222 > URL: https://issues.apache.org/jira/browse/YARN-3222 > Project: Hadoop YARN > Issue Type: Bug > Components: resourcemanager > Affects Versions: 2.6.0 > Reporter: Rohith > Assignee: Rohith > Priority: Critical > Attachments: 0001-YARN-3222.patch, 0002-YARN-3222.patch, > 0003-YARN-3222.patch > > > When a node is reconnected,RMNodeImpl#ReconnectNodeTransition notifies the > scheduler in a events node_added,node_removed or node_resource_update. These > events should be notified in an sequential order i.e node_added event and > next node_resource_update events. > But if the node is reconnected with different http port, the oder of > scheduler events are node_removed --> node_resource_update --> node_added > which causes scheduler does not find the node and throw NPE and RM exit. > Node_Resource_update event should be always should be triggered via > RMNodeEventType.RESOURCE_UPDATE -- This message was sent by Atlassian JIRA (v6.3.4#6332)