[
https://issues.apache.org/jira/browse/YARN-3225?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14389328#comment-14389328
]
Advertising
Hadoop QA commented on YARN-3225:
---------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12708492/YARN-3225-2.patch
against trunk revision 79f7f2a.
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 5 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. There were no new javadoc warning messages.
{color:green}+1 eclipse:eclipse{color}. The patch built with
eclipse:eclipse.
{color:red}-1 findbugs{color}. The patch appears to introduce 2 new
Findbugs (version 2.0.3) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-api
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-client
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-common
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager.
Test results:
https://builds.apache.org/job/PreCommit-YARN-Build/7176//testReport/
Findbugs warnings:
https://builds.apache.org/job/PreCommit-YARN-Build/7176//artifact/patchprocess/newPatchFindbugsWarningshadoop-yarn-common.html
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/7176//console
This message is automatically generated.
> New parameter or CLI for decommissioning node gracefully in RMAdmin CLI
> -----------------------------------------------------------------------
>
> Key: YARN-3225
> URL: https://issues.apache.org/jira/browse/YARN-3225
> Project: Hadoop YARN
> Issue Type: Sub-task
> Reporter: Junping Du
> Assignee: Devaraj K
> Attachments: YARN-3225-1.patch, YARN-3225-2.patch, YARN-3225.patch,
> YARN-914.patch
>
>
> New CLI (or existing CLI with parameters) should put each node on
> decommission list to decommissioning status and track timeout to terminate
> the nodes that haven't get finished.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)