[ 
https://issues.apache.org/jira/browse/YARN-3225?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14376444#comment-14376444
 ] 

Hadoop QA commented on YARN-3225:
---------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest 
attachment 
  http://issues.apache.org/jira/secure/attachment/12706513/YARN-3225-1.patch
  against trunk revision 7e6f384.

    {color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

    {color:green}+1 tests included{color}.  The patch appears to include 3 new 
or modified test files.

    {color:green}+1 javac{color}.  The applied patch does not increase the 
total number of javac compiler warnings.

    {color:green}+1 javadoc{color}.  There were no new javadoc warning messages.

    {color:green}+1 eclipse:eclipse{color}.  The patch built with 
eclipse:eclipse.

    {color:green}+1 findbugs{color}.  The patch does not introduce any new 
Findbugs (version 2.0.3) warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase 
the total number of release audit warnings.

    {color:red}-1 core tests{color}.  The patch failed these unit tests in 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-api 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-client 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-common 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager:

                  org.apache.hadoop.yarn.server.resourcemanager.TestRM

Test results: 
https://builds.apache.org/job/PreCommit-YARN-Build/7077//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/7077//console

This message is automatically generated.

> New parameter or CLI for decommissioning node gracefully in RMAdmin CLI
> -----------------------------------------------------------------------
>
>                 Key: YARN-3225
>                 URL: https://issues.apache.org/jira/browse/YARN-3225
>             Project: Hadoop YARN
>          Issue Type: Sub-task
>            Reporter: Junping Du
>            Assignee: Devaraj K
>         Attachments: YARN-3225-1.patch, YARN-3225.patch, YARN-914.patch
>
>
> New CLI (or existing CLI with parameters) should put each node on 
> decommission list to decommissioning status and track timeout to terminate 
> the nodes that haven't get finished.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to