That is exactly what I told them.  They are claiming OSHA this and OSHA that.  

I actually have done an AF24, by myself (with my accuaim) both ends in a half 
day.

Granted it was on 30 foot towers but still at 100’ I still could have done it 
in a day.  

From: Mathew Howard 
Sent: Monday, July 02, 2018 7:30 PM
To: AnimalFarm Microwave Users Group 
Subject: Re: [AFMUG] Tower climbing

That seems a bit crazy... and why would it take 2 days? 

I'd guess they're saying four guys, so they can do both ends at the same time. 
But it's only 100' up... I could do that by myself, in less than a full day...

On Mon, Jul 2, 2018 at 8:12 PM, Chuck McCown <[email protected]> wrote:

  I have a pair of PTP550s to hang and wire.  
  Long away from my base of operations.  About 100’ up on both ends.

  Have received two quotes to hang and aim:
  $5000

  $8000   ($14,000 if it goes to 2 days)

  Not sure why they think this needs 4 guys to do.  
  I am too old to do it myself, just don’t have the leg strength/endurance to 
be safe.  

  10x the cost of the radios to hang and aim???



  -- 
  AF mailing list
  [email protected]
  http://af.afmug.com/mailman/listinfo/af_af.afmug.com





--------------------------------------------------------------------------------
-- 
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com
-- 
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to