I try to have at least two sources for everything.  But I don’t have for 
enclosures and din rail snaps.  I did have to substitute two choke coils for a 
common mode double choke.  I have seen some of my problem parts shipping now.  
Plastic sdr11 conduit seems to be coming down.  Lumber prices are down.  I am 
optimistic.  But I normally am.

Sent from my iPhone

> On Sep 27, 2021, at 4:03 PM, Forrest Christian (List Account) 
> <[email protected]> wrote:
> 
> 
> I'm getting really tired of dealing with supply chain issues.   Like burnt 
> out, don't want to do this anymore, I've had enough tired.  
> 
> Just the things I'm dealing with today:
> 
> The last few days, all of my spare time has been related to reviewing options 
> to replace a part which has become unobtainum.   Like as in, manufacturer has 
> moved from a long lead time to 'don't bother asking'.   This seems to happen 
> on a recurring basis now (with different parts) - versus pre-covid it was 
> maybe once every year or two (since I'm careful to select parts to avoid this 
> issue).   I've had one part I've had to switch vendors on like 6 times now.   
> 
> And it's not just parts, my enclosure manufacturer for the rackinjectors sent 
> us this gem today:
> 
> "We had the enclosures ready for pickup since last week, but our road is 
> under maintenance and the whole street got ripped off. My forklift is not 
> able to get off from our driveway to the road because the step is very steep. 
> I heard the city will start paving tomorrow. Hopefully we can load the pallet 
> by Wednesday."
> 
> Can we please go back to the way it was in 2019 sometime soon?
> 
> -- 
> - Forrest
> -- 
> AF mailing list
> [email protected]
> http://af.afmug.com/mailman/listinfo/af_af.afmug.com
-- 
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to