What is the commit to the events center, and what level of service is going to go to the other end point?

If you can meet both commitments, just put them on different VLANs (if you need to separate the IP space), and done.

bp
<part15sbs{at}gmail{dot}com>

On 9/21/2015 8:48 AM, Josh Luthman wrote:
Is there any benefit in doing the TDD PTP besides the limiting factor of only 1 SM?

I have a backhaul that's barely being used to an events center that is getting 80x80 megs. Inline (seriously, inline) is another business that needs service. I'm figuring I'd just changing it to TDD and enable room for 1 more radio.

Josh Luthman
Office: 937-552-2340
Direct: 937-552-2343
1100 Wayne St
Suite 1337
Troy, OH 45373

Reply via email to