Oh wow I thought these were under the new rules already since the power
seems to be so low...and they already had 5.1...


Josh Luthman
Office: 937-552-2340
Direct: 937-552-2343
1100 Wayne St
Suite 1337
Troy, OH 45373

On Mon, Sep 21, 2015 at 2:05 PM, George Skorup <[email protected]> wrote:

> I'm not sure what you mean. Cambium certified the ePMP under the old rules
> before the cutoff. You can get PTP EIRP in 5.1 (with OOBE restrictions at
> the band edges) and 5.7.
>
> On 9/21/2015 12:50 PM, Josh Luthman wrote:
>
> Is the ptp rule still in effect??? I thought that was gone with the 5 GHz
> changes.
>
> Josh Luthman
> Office: 937-552-2340
> Direct: 937-552-2343
> 1100 Wayne St
> Suite 1337
> Troy, OH 45373
> On Sep 21, 2015 1:24 PM, "George Skorup" <[email protected]> wrote:
>
>> PTP mode gets you PTP EIRP limits. I think that's the only difference.
>>
>> On 9/21/2015 10:48 AM, Josh Luthman wrote:
>>
>>> Is there any benefit in doing the TDD PTP besides the limiting factor of
>>> only 1 SM?
>>>
>>> I have a backhaul that's barely being used to an events center that is
>>> getting 80x80 megs.  Inline (seriously, inline) is another business that
>>> needs service.  I'm figuring I'd just changing it to TDD and enable room
>>> for 1 more radio.
>>>
>>> Josh Luthman
>>> Office: 937-552-2340
>>> Direct: 937-552-2343
>>> 1100 Wayne St
>>> Suite 1337
>>> Troy, OH 45373
>>>
>>
>>
>

Reply via email to