I double checked with engineering, and Robbie's response is correct. There is one caveat, however. They do need to go under the bike path north of the beltline. The current plan is that they will tunnel under the path, but they do have permission to open cut the path if necessary. In that case, they are supposed to install Path Closed signs at the nearest access points either side of the cut, and to minimize the duration of time the path is closed. Again, hopefully, they will not have to do this.
Arthur Ross Pedestrian-Bicycle Coordinator >>> Robbie Webber <[EMAIL PROTECTED]> 06/04/03 08:58AM >>> At 08:27 AM 06/04/2003 -0500, Alan Furchtenicht wrote: >Does anybody have further information on the utility work they are >currently doing next to the southwest path between Midvale Blvd and the >Beltline? They also have spraypainted markings down the middle of the path. >Are they going to be ripping up the pavement, or what? MG&E is doing utility work. Burying transmission lines, I think. I don't believe it will involve ripping up pavement or otherwise disturbing the path. It might be noisy and a bit dirty, and there will need to be some replantings done along the path, but nothing major. "Never doubt that a small group of dedicated individuals working together can change the world. Indeed, it's the only thing that ever has." -- Margaret Mead _______________________________________________ Bikies mailing list [EMAIL PROTECTED] http://www.danenet.org/mailman/listinfo/bikies _______________________________________________ Bikies mailing list [EMAIL PROTECTED] http://www.danenet.org/mailman/listinfo/bikies