I biked down to Basco last Sunday on a cool day with a headwind.  The
contractor was still installing the railings on the various bridge
approaches but the Type 3 road closed barriers were pushed aside.  The path
is descends from Verona Road (the railroad "Summit") to Basco, a negative
grade of about 1%.  South of Purcell Road on the limestone screenings or
gravel portion of the road, the railway bed cuts through the ridge and
exposed vertical rock outcroppings line the path.

 

The gravel portion could use blading so be careful of a few frame jarring
potholes.

 

I enjoyed a brew at Mary's Tavern in Basco, a small basement affair with 6'
8" ceilings and biked home, a total distance of about 21 miles.

 

From: [email protected]
[mailto:[email protected]] On Behalf Of Dan Ross
Sent: Saturday, October 09, 2010 9:28 PM
To: [email protected]
Subject: [Bikies] Badger State Trail status?

 

Is the Badger State Trail finished yet through Fitchburg?  Tomorrow will be
SO nice...a casual ride down to Illinois is tempting.

The Badger Trail promotion site says it's open:
http://www.badger-trail.com/

DNR's web site still says it's closed:
http://dnr.wi.gov/org/land/parks/specific/badger/
"The 6 miles from Purcell Road to Lovell Lane, near the Madison-Fitchburg
city limits is closed until paving is complete."

BFW's web site event listing  for the grand opening in mid-September said it
was 1.1 miles from Cty M to Purcell that was not open yet, not 6 miles.

Then there was a request on the bikies list from someone at DNR I think to
NOT use the trail for safety and allowing workers to finish their work
unencumbered.

But hey..winter's coming--so...

What's the scoop?

Thanks,
Dan

_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org

Reply via email to