I was wondering why there was that longish, rough gravel section.  Now I
know.

Does this listserve accept attachments like pictures of maps?  It would be
nice to see a map of the area and its plans.

Mary Mullen


On 8/14/14 4:48 PM, "Steve Arnold" <[email protected]> wrote:

> On 8/14/2014 12:38 AM, Zack DeLand wrote:
> Is there any word when we'll have
> a paved path all the way from the
> bicycle interchange to the Military Ridge
> trailhead south of McKee Road?
> Seems like this was promised by mid-to-late
> summer but I see only gravel
> every time I ride past.

Good question, Zack!
> I checked with our interim city engineer today to 
get up-to-date
> information.

The City of Fitchburg is connecting McKee Rd with the Verona Rd
> south 
frontage road with two new streets this construction season.  Spoke Dr
> 
will generally head east from the frontage road through the former 
Harder
> wholesale grocery building, intersecting with Sprocket Dr, which 
will go
> north from McKee near the current Thermo-Fisher private 
driveway.  The gravel
> area on the Military Ridge Path between the 
bicycle interchange and McKee Rd
> is where Spoke Dr will intersect with 
the path.

The intersection of Spoke
> and the path will be grade-separated, with the 
path in a tunnel under the
> road and access paths on each side of Spoke 
connecting the Spoke bike lanes
> with the path.  The path will be closed 
from time to time through the
> construction period when it is unsafe, 
while the tunnel and road are
> constructed.  At other times, it will be 
open, but the gravel surface may be
> unsuitable for road tires.  Hikers 
and mountain bikes should have no problem.
> When that segment of the 
path is closed, path users will be directed to
> detours by the Badger 
State Trail and McKee Rd or by the Capital City State
> Trail.

Spoke and Sprocket Drs and the Military Ridge Path, including the
> tunnel 
and the controversial south-side access path at the new McKee Rd
> bridge, 
should be fully open for users in mid-October.  The path is planned
> to 
be plowed for winter use, so hardy riders will be able to use it yet in
> 
2014.

Interim City Engineer Ahna Bizjak will receive a copy of this notice,
> 
and if I got any of it wrong, I'll provide an update.
-- 
Steve Arnold,
> Fitchburg Alder, District 4, Seat 7
2530 Targhee Street, Fitchburg, Wisconsin
> 53711-5491
Telephone +1 608 278 7700 · Facsimile +1 608 278
> 7701
[email protected] · http://Arnold.US
Become a supporter: like
> http://facebook.com/ArnoldforAlder.
__________________________________________
> _____
Bikies mailing
> list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-dan
> enet.org



_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org

Reply via email to