OK Dan,

About troweling.

I have three trowls I use, I will have to replace two next job if it is of any 
size, the third one is more commonly used for sticking mortar onto cement 
blocks or bricks. I will describe them.

The mortar one is a flat steel plate roughly triangular in shape about 14 
inches long from heel to toe shaped more or less like a linin iron. The handle 
comes off the top surface toward the rear sticking back. It is useful for 
working down along the form to get voids and bubbles out of the cement but it 
also works well as a small float or to pat the surface to help work up the 
cream. This tool isn't often used by cement workers, more commonly by brick and 
block layers but because I have one I often use it with cement as well.

The more commonly used trowel is a rectangular piece of steel with a handle 
welded to one surface. These come in different sizes too. Mine is out in the 
shed just now but I guess it is about 12 inches by four inches. With the handle 
right over the center it is pretty good for tamping but the edge can be worked 
under things like the form for stair risers and it can be used as a float to.

Finally there is the edging tool. This is about 6 inches long and about two and 
a half wide maybe three. It is rolled down on one edge and the ends are gently 
turned up. there is a handle across the non-working surface and it is used 
sliding lengthways to form a round over on the edge of concrete. Another common 
edging tool is a similar dimension but with a square bar running the length of 
the middle of the working surface. This is often used to form an edge on mating 
ends of sidewalk slabs while the round-over is more usually used to form the 
edges of the sidewalk slabs or the leading edges of stair treads.

Another tool I and many other cement workers use is a length of board about 
thirty to thirty-six inches long and approaching four inches wide, a length of 
2 by 4 will work fine but more usually one uses a bit of three quarter inch 
plywood, I am not sure why except maybe for the weight. You form a handle at 
right angles to one surface, usually people seem to form a "D" handle also of 
wood. This tool is usually the first one selected for tamping and screeding the 
surface flat. These seem to be home made tools, quite possibly there are 
commercial ones available but I have never seen one but I have seen many 
professional and amateur builders use them.

Now in a big project the cement is first leveled with a bull float, a large 
flat think on a long arm handle. This is how they usually begin leveling 
something like a slab or basement floor, they may walk out on parts of it using 
plywood or something else to bear weight but usually they try not to do so. 
Once the slab begins to set up it is usual for commercial builders to get out 
on it with a power trowel which is something like a big floor polisher but with 
ceiling fan like paddles under it. Once the cement will hold a man without 
leaving significant prints this tool is worked over and over and over the floor 
along with gentle dampening which is how they get that wonderful smooth 
surface. It can be done by hand of course but it is murder on the back and 
knees and much slower.

So, take your wooden trowel to firmly pat the concrete down and because of it's 
length to screed the surface reasonably level and flat by working it back and 
forth across the surface then take your rectangular trowel and similarly float 
it gently over the surface at first to get a feel for flat and level and as you 
work you will be polishing and bringing up the water with the light aggregate 
(the cream). this I always rather enjoy though it is murder on knees and back 
and hands.

You may wish to repeat this step as the cement cures, it is remarkable how you 
can work up even more water when the surface feels really quite dry. That is 
often about the time to begin the edge treatment if you plan to do edge 
treatment, I recommend it as it really does add finish.

Now for your sloping edges, if I understand you, this is an edge wall to the 
steps which begins ascending with a vertical face then slopes toward the middle 
for some distance before again ascending vertically. This would have to be 
formed up. It is nothing more than a design or decorative feature. One set of 
stairs I poured I formed up the sides thicker at top and bottom by applying a 
board top and bottom to the outside of the form which stepped it out about an 
inch for a height I think of four inches at the top and the bottom for 
decorative purposes mainly but to reinforce the side wall of the form. In your 
case it might also have been used to reduce the volume of cement required.

I am not so sure bricks are a good filler material. Bricks are usually fired 
clay and might disintegrate embedded in concrete but cement block and rock and 
boulders and old scrap steel all work well.

I suppose the old plywood box would ultimately rot and disappear I don't really 
know. Those steps were about three and a half feet wide and the top probably 
thirty inches front-to-back so allowing six inches each side and front and back 
the unsupported top would have been something like 30 inches wide and 18 or 20 
inches deep and six inches thick. Should support a lot of weight, you might 
know a mechanical engineer who could give you more specific loading 
characteristics. I didn't put any rebar or pipe in it but I probably should 
have, you easily could, cut old bed frames or angle iron or just about anything 
to span the void and remember to set it in a little above the box. You could 
use rebar and form some skeleton inside tying it together with wire to keep it 
sinking in the wet concrete, the correct way of course is to weld it but I just 
remember that my father's generation didn't use rebar and they seemed to get 
away with it. You could even pull heavy galvanized steel wire through holes in 
the form weaving it back and forth and twisting it really tight to retain the 
forms while pouring. You then cut the wires off to remove the forms then cut 
them flush to the surface of the cement when you remove the forms. This steel 
wire will offer reinforcement to the cement. If you are really ambitious you 
might even parge a decorative surface over the walls to hide the wire ends.

You can have loads of fun with forms of course, line the inside with that wavy 
plastic material often used for greenhousing and other roofing to add 
decoration. some even comes with a sort of grain pattern in it.

Just remember that a slight angle or bevel makes removing the forms so much 
easier. Even a 90 degrees corner can grip every bit as tight as a dovetail.

Remember too that the lime in cement will burn the skin off of you and it is 
carried in the water. I took the skin off of the front of my shins several 
years ago not hardly noticing that moisture was accumulating on the front of my 
work genes while I was troweling. Generally now I keep a rubber glove on my 
right hand and because I can't work well in a glove I keep a bucket of clear 
water around and an old towel so I have my left hand more or less free for 
touching but ready also for rinsing. Nevertheless I generally end up burning my 
finger prints off.

I think I have addressed your questions, just let me know if I can clarify 
anything further.



Dale Leavens, Cochrane Ontario Canada
[EMAIL PROTECTED]
Skype DaleLeavens
Come and meet Aurora, Nakita and Nanook at our polar bear habitat.


  ----- Original Message ----- 
  From: Dan Rossi 
  To: [email protected] 
  Sent: Wednesday, May 23, 2007 4:38 PM
  Subject: Re: [BlindHandyMan] pouring cement stairs.


  Thanks guys. I knew I could count on you. This is a future project, so I 
  have some time to learn and do some experimenting.

  So Dale, I can build a hollow box and pour the steps over that? Will the 
  wood eventually rot and the concrete will be strong enough to maintain 
  it's structure?

  The side walls on my steps have this sloped section in the middle. The 
  walls are about 14 inches wide. The walls have a flat spot at the top, a 
  flat spot at the bottom, and this sloped section connecting the upper and 
  lower plateau. Will the concrete be stiff enough to maintain that sloped 
  surface, or would that have to be covered with the form?

  As far as the rubble. So I can just throw in anything rock-like into the 
  wet concrete? Will cement blocks and old bricks be OK? As long as it 
  stays well away from the edges.

  Now, here is the really nieve question. When you talk about troweling and 
  really working the trowel, what does that mean exactly? Are you just 
  moving the trowel back and forth smoothing over the surface? Are you 
  tapping and patting the surface as well as moving back and forth across 
  it? Are you plunging the edge of the trowel repeatedly into the surface 
  to push down the aggregate and get the cream to float to the top?

  I think I might try making a few stepping stones before I try my hand at 
  anything larger.

  -- 
  Blue skies.
  Dan Rossi
  Carnegie Mellon University.
  E-Mail: [EMAIL PROTECTED]
  Tel: (412) 268-9081


   

[Non-text portions of this message have been removed]



To listen to the show archives go to link
 http://acbradio.org/handyman.html
or
ftp://ftp.acbradio.org/acbradio-archives/handyman/

The Pod Cast address for the Blind Handy Man Show is.
http://www.acbradio.org/news/xml/podcast.php?pgm=saturday

The Pod Cast address for the Cooking In The Dark Show is.
http://www.gcast.com/u/cookingindark/main.xml

Visit The Blind Handy Man Files Page To Review Contributions From Various List 
Members At The Following address:
http://www.jaws-users.com/handyman/

Visit the new archives page at the following address
http://www.mail-archive.com/[email protected]/  
For a complete list of email commands pertaining to the Blind Handy Man list 
just send a blank message to:
[EMAIL PROTECTED] 
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/blindhandyman/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/blindhandyman/join
    (Yahoo! ID required)

<*> To change settings via email:
    mailto:[EMAIL PROTECTED] 
    mailto:[EMAIL PROTECTED]

<*> To unsubscribe from this group, send an email to:
    [EMAIL PROTECTED]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/
 

Reply via email to