there are 5 screws on the outer cover. once that's removed you have to take
the inner cover off. 4 screws i think. after that you have to take the
connections off at the pump. and the 2, i think, screws out of the pump. be
sure to unplug it before you start and let it cool down. also be careful.
the first time i did it i broke off the connector on the boiler and had to
solder a new one on.


On Mon, Nov 11, 2013 at 4:15 PM, AndreyPhl <[email protected]> wrote:

> Appreciate the information. Is it fairly easy to get to the pump or do I
> have to disassemble half of the machine?
>
> On Monday, November 11, 2013 3:48:19 PM UTC-5, herman dickens wrote:
>>
>> it looks right to me. it's been a couple of years since i replaced the
>> last one. you will have to take fittings, etc. off the old pump if i
>> remember correctly.
>>
>>
>> On Mon, Nov 11, 2013 at 3:40 PM, AndreyPhl <[email protected]> wrote:
>>
>>> Thanks. Is that the one? https://www.chriscoffee.com/
>>> Ulka-Vibratory-Pump-EAX5-52-Watt-p/mg072.htm
>>>
>>>
>>>
>>  --
> You received this message because you are subscribed to the Google Groups
> "Brewtus" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to [email protected].
> To post to this group, send email to [email protected].
> Visit this group at http://groups.google.com/group/brewtus.
> For more options, visit https://groups.google.com/groups/opt_out.
>

-- 
You received this message because you are subscribed to the Google Groups 
"Brewtus" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/brewtus.
For more options, visit https://groups.google.com/groups/opt_out.

Reply via email to