Hi CASPER team,

I wanted to test the iADC tutorial on my ROACH but I can't.

I followed the tutorial changing XSG core from iBOB to sx95t and removing
ibop_lwip from original design. Simulation worked perfect but when I start
bee_xps the following error appears after a while twice:

ERROR: 2 constraints not met.

PAR could not meet all timing constraints. A bitstream will not be generated.

I saw what Mark Wagner recommended to see:
<model_directory>/XPS_ROACH_base/implementation/system_map.mrp

The thing I have here is a large file but I suspect that the problem is
around this part:

Asterisk (*) preceding a constraint indicates it was not met.
   This may be due to a setup or hold violation.

----------------------------------------------------------------------------------------------------------
  Constraint                                |    Check    | Worst Case | 
Best Case | Timing |   Timing
                                            |             |    Slack   |
Achievable | Errors |    Score
----------------------------------------------------------------------------------------------------------
* NET "iadc_test_adc/iadc_test_adc/adc_clk_ | MAXPERIOD   |    -1.666ns|  
         |       1|        1666
  buf" PERIOD = 10 ns HIGH 50%              | MINLOWPULSE |     4.666ns|  
  5.334ns|       0|           0
----------------------------------------------------------------------------------------------------------
* PERIOD analysis for net "iadc_test_adc/ia | SETUP       |     8.535ns|  
  1.465ns|       0|           0
  dc_test_adc/adc_clk_dcm" derived from  NE | HOLD        |     0.148ns|  
         |       0|           0
  T "iadc_test_adc/iadc_test_adc/adc_clk_bu | MINPERIOD   |     7.779ns|  
  2.221ns|       0|           0
  f" PERIOD = 10 ns HIGH 50%  duty cycle co | MAXPERIOD   |    -1.666ns|  
         |       1|        1666
  rrected to 10 nS  HIGH 5 nS               |             |            |  
         |        |
----------------------------------------------------------------------------------------------------------

Both constraints have a MAXPERIOD of -1.666ns, I don't know that a minus
have to do here with time, but is what the report says.

Do you have any insights of this?. Or I just disable the PAR timing check?

Best!

Daniel Herrera


Reply via email to