SEZ9 commented on PR #12862:
URL: https://github.com/apache/seatunnel/pull/12862#issuecomment-6568168288

   Following up on the approval-versus-rebasing question.
   
   The head is unchanged at `1ce4e26cdbdcac4cf2d901c807463fe82cdf2822`. The 
latest comparison against `dev` is `diverged`, ahead 3 / behind 21, with merge 
state `UNKNOWN` / `REVIEW_REQUIRED`. As noted earlier, that drift is recorded 
metadata only; it does not by itself request a sync, and no conflicts have been 
reported. If conflicts do surface, resolve them before the final approval/queue 
step.
   
   On CI: the blocking job remains unit-test (17, ubuntu-latest), run 
40828465494 / job 123297627304, where `PhysicalVertexTest` setup reports a node 
failing to start with port-binding errors; the Build at 123363531370 is 
`FAILURE`, and the connector shard was cancelled. The merged `d2fc2079035` 
changes HTTP-port allocation in other tests, not the `PhysicalVertexTest` 
fixture, so a simple sync is not a verified cure. I am not attributing a cause 
yet.
   
   Concrete asks:
   1. After confirming no newer Build is active, rerun the failed unit-test job 
and the cancelled connector shard.
   2. If `PhysicalVertexTest` still fails, paste the new port/startup 
diagnostics here so we can attribute it precisely.
   3. Keep this PR limited to the Spark decimal change; no unrelated engine or 
test-fixture edits.
   
   The decimal source changes remain clear from my side. This is a 
CI/merge-gate clarification, not an effective approval; a write-capable 
maintainer will do the final approval once the gates are green or the remaining 
failure is confirmed unrelated.
   
   <!-- streview-comment:2216 -->


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to