Vivek Ratan commented on HADOOP-4053:
-------------------------------------

I had a few questions/comments on _JobStatusChangeEvent_.

- agree with Hemanth that the old JobStatus and new JobStatus should be passed 
in explicitly. Otherwise there are hidden dependencies in the calling sequence. 
- It's not clear to me how we're naming the enum values for Events in 
_JobStatusChangeEvent_. What does RUN_STATE mean? Does it mean an event that 
cases a Job's run state to change? If so, do you mean the job was in a running 
state and changed to something else or that its state changed to a running 
state. I see the same enum value used for both. In 
CapacityScheduler.getTaskFromQueue(), you add a RUN_STATE event when the job's 
state changes from PREP to RUNNING. In JobTracker.finalizeJob(), you add a 
RUN_STATE event when the job's state changes from RUNNING To something else. I 
think you need to use separate events and name the events a little more 
consistently. Or else, just rename the enum to STATE_CHANGE, which can be used 
for any state change. This should be OK, given that you have an old and new job 
status and can figure out how the state changed. In general, the enum values 
should be verbs: FINISH_TIME_CHANGED , rather than FINISH_TIME. 
- I don't feel very comfortable with the fact that  _JobStatusChangeEvent_ can 
contain multiple Events? I see that the only use case is in the job recovery, 
when more than one attribute of a job status has changed. But, abstractly, 
having a single _JobStatusChangeEvent_ object handle multiple events is not 
intuitive. Each event changes the job status. Since _JobStatusChangeEvent_ only 
tracks a single pair of old and new JobStatus objects, what you're really 
saying is that you can add events as long as each one independently changes the 
job status without affecting the other events. What prevents a user, for 
example, from adding two RUN_STATE events? Each one changes the job status, but 
you can only keep track of two of them. I think conceptually, a 
_JobStatusChangeEvent_ object should map to a single event change, which in 
turn maps to a single pair of JobStatus objects. That's much cleaner. During 
the normal running of the JobTracker, you only create a _JobStatusChangeEvent_ 
object for a single event. It's only in that one use case for recovering jobs 
where you apply multiple changes to a job status, and i think it's ok to call 
updateJobListeners() multiple times. Otherwise, you muddle up the semantics of 
a _JobStatusChangeEvent_ object. 



> Schedulers need to know when a job has completed
> ------------------------------------------------
>
>                 Key: HADOOP-4053
>                 URL: https://issues.apache.org/jira/browse/HADOOP-4053
>             Project: Hadoop Core
>          Issue Type: Improvement
>    Affects Versions: 0.19.0
>            Reporter: Vivek Ratan
>            Assignee: Amar Kamat
>            Priority: Blocker
>         Attachments: HADOOP-4053-v1.patch, HADOOP-4053-v2.patch, 
> HADOOP-4053-v3.1.patch, HADOOP-4053-v3.2.patch
>
>
> The JobInProgressListener interface is used by the framework to notify 
> Schedulers of when jobs are added, removed, or updated. Right now, there is 
> no way for the Scheduler to know that a job has completed. jobRemoved() is 
> called when a job is retired, which can happen many hours after a job is 
> actually completed. jobUpdated() is called when a job's priority is changed. 
> We need to notify a listener when a job has completed (either successfully, 
> or has failed or been killed). 

-- 