Oh, thanks for all the explanation:-) I will talk with Wenhai about how they implement such function and try to finish this in one job.
Bests, Mingda On Tue, Oct 11, 2016 at 9:52 AM, 李文海 <[email protected]> wrote: > > > > > -----原始邮件----- > > 发件人: "Yingyi Bu" <[email protected]> > > 发送时间: 2016年10月12日 星期三 > > 收件人: [email protected] > > 抄送: > > 主题: Re: Let one Operator finished the job before another one begin in > Hyracks > > > > +1! > > > > Best, > > Yingyi > > > > On Tue, Oct 11, 2016 at 9:32 AM, Mike Carey <[email protected]> wrote: > > > > > BUT AGAIN: I think the preferred solution in this case is to do it in > one > > > job. Mingda, I would suggest sync'ing up with Wenhai for a Skype > meeting > > > on how he/Preston have done essentially the very same thing in their > use > > > cases for parallel sorts and interval joins. Hyracks has everything > needed > > > for this, as it turns out, without a multi-job need. > > > > > > > > > > > > On 10/11/16 9:26 AM, Yingyi Bu wrote: > > > > > >> You can search the usage of waitForCompletion in the code base, e.g.: > > >> > > >> APIFramework.java: > > >> > > >> public void executeJobArray(IHyracksClientConnection hcc, > > >> JobSpecification[] specs, PrintWriter out) > > >> throws Exception { > > >> for (JobSpecification spec : specs) { > > >> spec.setMaxReattempts(0); > > >> JobId jobId = hcc.startJob(spec); > > >> long startTime = System.currentTimeMillis(); > > >> hcc.waitForCompletion(jobId); > > >> long endTime = System.currentTimeMillis(); > > >> double duration = (endTime - startTime) / 1000.00; > > >> out.println("<pre>Duration: " + duration + " sec</pre>"); > > >> } > > >> > > >> } > > >> > > >> > > >> You start a job and get the job Id, and then you can wait on the job > id. > > >> > > >> > > >> Best, > > >> > > >> Yingyi > > >> > > >> > > >> On Tue, Oct 11, 2016 at 1:45 AM, 李文海 <[email protected]> wrote: > > >> > > >> Hi, Mingda. > > >>> What you need is quite familiar with what I and Presten have > done. > > >>> Actually, I think we just need a shared > > >>> object accommodated by joblet or task which should be also driven by > a > > >>> broadcast connector inbetween its input > > >>> and output operators. We can talk about this by skype if needed. > > >>> Best, Wenhai > > >>> > > >>> > > >>> -----原始邮件----- > > >>>> 发件人: "Mike Carey" <[email protected]> > > >>>> 发送时间: 2016年10月11日 星期二 > > >>>> 收件人: [email protected] > > >>>> 抄送: > > >>>> 主题: Re: Let one Operator finished the job before another one begin > in > > >>>> > > >>> Hyracks > > >>> > > >>>> And both Wenhai and Preston have examples of doing the > > >>>> fan-in-and-compute/fan-back-out pattern with blocking until the > latter > > >>>> part is done - Wenhai for finding range split points for parallel > > >>>> sorting and Preston for similar things that arise in interval joins. > > >>>> Can you guys chime in when you have a chance? (Preston may be busy > from > > >>>> what I saw on Skype on Friday :-), with congrats being due!) > > >>>> > > >>>> > > >>>> On 10/11/16 12:22 AM, Jianfeng Jia wrote: > > >>>> > > >>>>> Based on the described example, it seems possible to implement it > in > > >>>>> > > >>>> one job by using MToNPartitioningConnectorDescriptor. > > >>> > > >>>> You can force that merge-BF-operator only runs in one partition by > > >>>>> > > >>>> using PartitionConstraintHelper.addAbsoluteLocationConstraint() > > >>> function. > > >>> > > >>>> On Oct 10, 2016, at 11:43 PM, mingda li <[email protected]> > > >>>>>> > > >>>>> wrote: > > >>> > > >>>> Yeah, that will be easier. But for example, we have N nodes and in > > >>>>>> > > >>>>> each > > >>> > > >>>> node, it will generate a Bloom Filter(BF) for its own data. We need > > >>>>>> > > >>>>> to send > > >>> > > >>>> these BFs to one node for constructing a complete BF and then send > > >>>>>> > > >>>>> the BF > > >>> > > >>>> back to each node. I am not sure we can use multiple stage job for > > >>>>>> > > >>>>> this, > > >>> > > >>>> because there should be a 1->N and a N->1 connecter among nodes. If > > >>>>>> > > >>>>> in one > > >>> > > >>>> job, there may be no way to transfer data among nodes. > > >>>>>> This is my idea. If this can be implemented by one multiple stage > > >>>>>> > > >>>>> job, that > > >>> > > >>>> will decrease a lot of my work :-) > > >>>>>> > > >>>>>> Bests, > > >>>>>> Mingda > > >>>>>> > > >>>>>> On Mon, Oct 10, 2016 at 8:59 PM, Mike Carey <[email protected]> > > >>>>>> > > >>>>> wrote: > > >>> > > >>>> Is there a reason for wanting two jobs? I would think that one > > >>>>>>> > > >>>>>> multiple > > >>> > > >>>> stage job would be preferable. > > >>>>>>> > > >>>>>>> On Oct 10, 2016 1:21 PM, "mingda li" <[email protected]> > wrote: > > >>>>>>> > > >>>>>>> Oh, thanks Kim~ > > >>>>>>>> > > >>>>>>>> On Mon, Oct 10, 2016 at 12:55 PM, Taewoo Kim < > [email protected]> > > >>>>>>>> > > >>>>>>> wrote: > > >>> > > >>>> Forwarded to dev. > > >>>>>>>>> > > >>>>>>>>> Best, > > >>>>>>>>> Taewoo > > >>>>>>>>> > > >>>>>>>>> ---------- Forwarded message ---------- > > >>>>>>>>> From: mingda li <[email protected]> > > >>>>>>>>> Date: Mon, Oct 10, 2016 at 11:21 AM > > >>>>>>>>> Subject: Let one Operator finished the job before another one > > >>>>>>>>> > > >>>>>>>> begin in > > >>> > > >>>> Hyracks > > >>>>>>>>> To: [email protected] > > >>>>>>>>> > > >>>>>>>>> > > >>>>>>>>> Hi, > > >>>>>>>>> > > >>>>>>>>> Now,I am trying to build a Bloom Filter(BF) before join. The > BF is > > >>>>>>>>> > > >>>>>>>> build > > >>>>>>> > > >>>>>>>> in > > >>>>>>>> > > >>>>>>>>> each node and sent to one node to combine. I want to set a stop > > >>>>>>>>> > > >>>>>>>> sign > > >>> > > >>>> there > > >>>>>>>> > > >>>>>>>>> before sending the BF in each node. The stop sign means it can > only > > >>>>>>>>> > > >>>>>>>> send > > >>>>>>> > > >>>>>>>> the BF after it is build. > > >>>>>>>>> The class HyracksConnection.waitForCompletion may help this. > But > > >>>>>>>>> > > >>>>>>>> I am > > >>> > > >>>> not > > >>>>>>>> > > >>>>>>>>> sure how to use it. > > >>>>>>>>> Should I build two jobs: hcc.waitForCompletion(jobBuildBF); > > >>>>>>>>> jobidSendBF=hcc.startJob(); ? > > >>>>>>>>> Has anyone ever used the HyracksConnection.waitForCompletion? > > >>>>>>>>> > > >>>>>>>>> Thanks, > > >>>>>>>>> Mingda > > >>>>>>>>> > > >>>>>>>>> > > >>> > > > > >