I think there will also be some helpful design documents that he and
Preston can both share (with pics of the Hyracks jobs and the
activities/stages involved).
On 10/11/16 10:52 AM, mingda li wrote:
Oh, thanks for all the explanation:-)
I will talk with Wenhai about how they implement such function and try to
finish this in one job.
Bests,
Mingda
On Tue, Oct 11, 2016 at 9:52 AM, 李文海 <[email protected]> wrote:
-----原始邮件-----
发件人: "Yingyi Bu" <[email protected]>
发送时间: 2016年10月12日 星期三
收件人: [email protected]
抄送:
主题: Re: Let one Operator finished the job before another one begin in
Hyracks
+1!
Best,
Yingyi
On Tue, Oct 11, 2016 at 9:32 AM, Mike Carey <[email protected]> wrote:
BUT AGAIN: I think the preferred solution in this case is to do it in
one
job. Mingda, I would suggest sync'ing up with Wenhai for a Skype
meeting
on how he/Preston have done essentially the very same thing in their
use
cases for parallel sorts and interval joins. Hyracks has everything
needed
for this, as it turns out, without a multi-job need.
On 10/11/16 9:26 AM, Yingyi Bu wrote:
You can search the usage of waitForCompletion in the code base, e.g.:
APIFramework.java:
public void executeJobArray(IHyracksClientConnection hcc,
JobSpecification[] specs, PrintWriter out)
throws Exception {
for (JobSpecification spec : specs) {
spec.setMaxReattempts(0);
JobId jobId = hcc.startJob(spec);
long startTime = System.currentTimeMillis();
hcc.waitForCompletion(jobId);
long endTime = System.currentTimeMillis();
double duration = (endTime - startTime) / 1000.00;
out.println("<pre>Duration: " + duration + " sec</pre>");
}
}
You start a job and get the job Id, and then you can wait on the job
id.
Best,
Yingyi
On Tue, Oct 11, 2016 at 1:45 AM, 李文海 <[email protected]> wrote:
Hi, Mingda.
What you need is quite familiar with what I and Presten have
done.
Actually, I think we just need a shared
object accommodated by joblet or task which should be also driven by
a
broadcast connector inbetween its input
and output operators. We can talk about this by skype if needed.
Best, Wenhai
-----原始邮件-----
发件人: "Mike Carey" <[email protected]>
发送时间: 2016年10月11日 星期二
收件人: [email protected]
抄送:
主题: Re: Let one Operator finished the job before another one begin
in
Hyracks
And both Wenhai and Preston have examples of doing the
fan-in-and-compute/fan-back-out pattern with blocking until the
latter
part is done - Wenhai for finding range split points for parallel
sorting and Preston for similar things that arise in interval joins.
Can you guys chime in when you have a chance? (Preston may be busy
from
what I saw on Skype on Friday :-), with congrats being due!)
On 10/11/16 12:22 AM, Jianfeng Jia wrote:
Based on the described example, it seems possible to implement it
in
one job by using MToNPartitioningConnectorDescriptor.
You can force that merge-BF-operator only runs in one partition by
using PartitionConstraintHelper.addAbsoluteLocationConstraint()
function.
On Oct 10, 2016, at 11:43 PM, mingda li <[email protected]>
wrote:
Yeah, that will be easier. But for example, we have N nodes and in
each
node, it will generate a Bloom Filter(BF) for its own data. We need
to send
these BFs to one node for constructing a complete BF and then send
the BF
back to each node. I am not sure we can use multiple stage job for
this,
because there should be a 1->N and a N->1 connecter among nodes. If
in one
job, there may be no way to transfer data among nodes.
This is my idea. If this can be implemented by one multiple stage
job, that
will decrease a lot of my work :-)
Bests,
Mingda
On Mon, Oct 10, 2016 at 8:59 PM, Mike Carey <[email protected]>
wrote:
Is there a reason for wanting two jobs? I would think that one
multiple
stage job would be preferable.
On Oct 10, 2016 1:21 PM, "mingda li" <[email protected]>
wrote:
Oh, thanks Kim~
On Mon, Oct 10, 2016 at 12:55 PM, Taewoo Kim <
[email protected]>
wrote:
Forwarded to dev.
Best,
Taewoo
---------- Forwarded message ----------
From: mingda li <[email protected]>
Date: Mon, Oct 10, 2016 at 11:21 AM
Subject: Let one Operator finished the job before another one
begin in
Hyracks
To: [email protected]
Hi,
Now,I am trying to build a Bloom Filter(BF) before join. The
BF is
build
in
each node and sent to one node to combine. I want to set a stop
sign
there
before sending the BF in each node. The stop sign means it can
only
send
the BF after it is build.
The class HyracksConnection.waitForCompletion may help this.
But
I am
not
sure how to use it.
Should I build two jobs: hcc.waitForCompletion(jobBuildBF);
jobidSendBF=hcc.startJob(); ?
Has anyone ever used the HyracksConnection.waitForCompletion?
Thanks,