Can anyone explain the life extension process here? If we do all the required work and tests as per the schedule and it is signed out by a inspector with a survey ticket, why do we have to deal with the Diamond factory? Rob
PO Box 129, Lawson, NSW, 2783. mobile 0429 493828
