Agree but think they want our results so as they can work out what problems
are.

I discovered HK 36 first inspection is 6000 hrs which is interesting.

Ian m
On May 30, 2012 4:32 PM, "Rob Thompson" <[email protected]> wrote:

> Can anyone explain the life extension process here?
> If we do all the required work and tests as per the schedule and it is
> signed out by a inspector with a survey ticket, why do we have to deal with
> the Diamond factory?
> Rob
>
>
> PO Box 129,
> Lawson, NSW, 2783.
> mobile 0429 493828
>
>
>

Reply via email to