Yeh the grade of paper is to stop you from damaging the outer glass layer. 
Probably faster to use an angle grinder with 80 grit paper disk and laminate a 
replacement layer afterwards but that does require repair qualifications and 
thus why they want you to use a fine grit paper.
Nige.


From: Laurie Hoffman 
Sent: Monday, November 19, 2012 5:37 PM
To: [email protected] 
Subject: Re: [DOG mailing list] H36 3000 hourly

Hi Ian,
I'm probably jumping the gun on Nige here and taking words out of his mouth.

He said that he believes the terms 'plate' and 'panel' to be synonymous in the 
translation process. This makes so much better sense when you read the work 
order. i too was thinking the translation was from German to English but as Col 
Brock pointed out it is probably from Austrian to English. 

Nige said that the upper and lower surfaces of the spar tunnel are non 
structural and that he had cut a large inspection 'panel' out of the lower 
surface for another task which verifies that. It is the front and rear of the 
tunnel which is structural.

I just had a look at the worker order for the root rib again. i'm cant see any 
requirement for gelcoat removal inside the wing Ian. It calls for complete 
removal of the paint from the outside of the root rib, coating with a clear 
epoxy resin to reseal and and which will enhance crack detection in the outer 
root rib.  the paint removal is a bugger of a job as supposed to be done with 
160 grade paper or finer. 




Regards
Laurie Hoffman



--------------------------------------------------------------------------------
From: Ian Mc Phee <[email protected]>
To: [email protected] 
Sent: Monday, 19 November 2012 5:27 PM
Subject: Re: [DOG mailing list] H36 3000 hourly


That is exactly the thing has brought me to a stop as seems solid to me 
Thinking we should get the German version and have dieter Hildenbrand see what 
he thinks as his 3000hly is due in 200hrs. In wings we had no gelcote on the 
inner D section of wing as they speak of removing the Gelcote and we have the 
hole already cut 
Ian m


On 19 November 2012 17:09, Rob Thompson <[email protected]> wrote:

              G'day All,
                    The 3000 hour schedule calls to "...Separate upper spar 
tunnel plate from bulkhead. Leave 10mm rim" 
                    Nigel has a bit of experience dealing with translated 
German. He suggested that this probably means that the upper section of the 
spar tunnel (which is non-structural) needs to be cut out leaving a lip along 
the front and rear remaining as a guide for the spars when rigging. Then use 
the resulting hole for inspection purposes of the upper interior of the 
structural bulkhead.
                    I am thinking just some appropriately spaced holes and then 
a bore-a-scope inspection would do the trick.
                    Has anyone done this part of the survey inspection?
              cheers
              Rob



              PO Box 129,
              Lawson, NSW, 2783.
              mobile 0429 493828



















              .............................................

              --- On Tue, 6/11/12, Angel Jimenez Martin <[email protected]> 
wrote:


                From: Angel Jimenez Martin <[email protected]>
                Subject: [DOG mailing list] H-36 Service Bulletin NÂș 19
                To: "[email protected]" <[email protected]>
                Received: Tuesday, 6 November, 2012, 6:02 AM


                Hi all,

                As I said I bought an H-36 Dimona that has been many years 
parked in a hangar and currently only 120 flight hours.
                He has not been done the service bulletin No 19 "metal fitting 
addicional conection fuselage-wing".
                I have leaves to make "work instruction No. 6" and have asked 
the Diamond Dealers Spain an offer but he ask the part numbers.
                Anyone know these P/N?
                It is absolutely necessary to make this connection?.

                Regards.
                 
                Angel
             
       