Hello,
 
In the process of evaluating replacement equipment that meets the requirements
of IEC 61000-3-2:2000/IEC61000-4-7 and IEC61000-3-3+A1/IEC61000-4-15,  I put
together a small Electronic Load based on an old HP/Agilent verification
process.
 
 Circuit = Relayand bypass switch to  Lamp Dimmer with 200W bulb across line
connected to - 3 -Glocoils in parallel with 2 Glocoils to other side of
line.Parts availiability limited voltage to 120V.
 
Well , I gathered three vendors equipments, performed a bunch of tests, with
the following results:
 
Stationary Harmonics - All very Close 
Fluctuating harmonics - All over the place
Flicker,- With Lamp Dimmer and 200W Bulb - Large differences between Test
Equipment, consistently the same.
 
Since these results are all over the place I would like to set up a quick
Round-Robin in the Sacramento/Bay Area , CA the first week of March. For
scheduling I would bring the unit around to the Test laboratories with
different Test Equipment that meets the "NEW" requirements and  then schedule
the others.
 
Tests would consist of :
 
Stationary Harmonics 
Fluctuating Harmonics
Flicker with Dimmer and bulb - 10 Min
Flicker without - 10 Min
 
 
Thanks,
 
Ken Hall
Hewlett Packard
916-785-4819
 
 
 



This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

Visit our web site at:  http://www.ieee-pses.org/

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Ron Pickard:              [email protected]
     Dave Heald:               [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]
     Jim Bacher:             [email protected]

All emc-pstc postings are archived and searchable on the web at:
    http://www.ieeecommunities.org/emc-pstc

Reply via email to