In message 
<be3336be85968d49be01e66d6e365b1e01921...@sjc1amfpew01.am.sanm.corp>, 
dated Mon, 5 Feb 2007, "Tarver, Peter" <[email protected]> 
writes
>I have performed around six to ten of these tests at the 200 A level. 
>In each case, the circuit breaker I used opened in less than half a 
>cycle.

But there are breakers (in Europe, anyway) which have a delay to cope 
with high inrush currents.

>I have experienced no noncompliances.  In fact, the earthing impedance 
>_improved_ after the fault condition was imposed.

Any joints with 'asperities' (roughnesses with points) or 
semi-conducting oxide layers become welded when the high current passes.
-- 
OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
There are benefits from being irrational - just ask the square root of 2.
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK

-

This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas           [email protected]
     Mike Cantwell           [email protected]

For policy questions, send mail to:

     Jim Bacher:             [email protected]
     David Heald:            [email protected]

All emc-pstc postings are archived and searchable on the web at:

    http://www.ieeecommunities.org/emc-pstc

______________________________________________________________________
This email has been scanned by the MessageLabs Email Security System.
For more information please visit http://www.messagelabs.com/email 
______________________________________________________________________

Reply via email to