Jim,

 

I assume your product maybe considered a machine or a product that could be
used in a factory or in an industrial environment. I’m not an expert in this
area but I recall a requirement to keep AC Mains wiring a certain distance off
the floor in factory machines where it is common to have the floor washed with
high pressured water. I’m not sure if this requirement is covered in the EN
60204 or only in local electric codes. 

 

Sorry this wasn’t the specific answer you were looking for. 

 

The Other Brian

 

________________________________

From: [email protected] [mailto:[email protected]] On Behalf Of Goedderz, Jim
Sent: Wednesday, December 15, 2010 1:52 PM
To: [email protected]
Subject: RE: Power line connections

 

Some additional information for you all.

 

The product is conduit connected, and the concern is the internal hook up
terminal block.

 

We did consider that this might be Italy only, but the notice included the
reference to “the official recommendation of the European Community”.

 

There does appear to be an exception for products that are resistant to water
ingress. Ours it not.

 

The number we have is 30cm  ; )

 

Thank you all for the responses so far.

 

James Goedderz

Sr. Principal Engineer-Product Safety

Sensormatic Electronics, LLC

561.912.6378

 

From: Kunde, Brian [mailto:[email protected]] 
Sent: Wednesday, December 15, 2010 1:34 PM
To: Goedderz, Jim; [email protected]
Subject: RE: Power line connections

 

OR is it that you have to keep the power cord off the floor by 30cm?  That can
make sense in wet locations. How is this to be done?

 

 

Are you talking about the location of the receptacle your device will plug
into or where your power cord comes out the back of your product?

 

The Other Brian

 

________________________________

From: [email protected] [mailto:[email protected]] On Behalf Of Goedderz, Jim
Sent: Wednesday, December 15, 2010 12:10 PM
To: [email protected]
Subject: Power line connections

 

Group,

After the installation of a new product in Italy, we are being told that there
is a technical detail that appears not in line with the official
recommendation of the European Community.

The power line MUST be located at a minimum of 30 cm up from the floor.

Can anyone provide substantiation of the 30cm claim?

Providing the source would also be a big plus.

Even “I am not aware of that” answers would be helpful. (Privately if
desired).

Thank you.

James Goedderz

Product Safety Engineer

Tyco/Sensormatic

[email protected]

_________________________ 

LECO Corporation Notice: This communication may contain confidential
information intended for the named recipient(s) only. If you received this by
mistake, please destroy it and notify us of the error. Thank you. 

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://product-compliance.oc.ieee.org/
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 

_________________________ 

LECO Corporation Notice: This communication may contain confidential
information intended for the named recipient(s) only. If you received this by
mistake, please destroy it and notify us of the error. Thank you. 
-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://product-compliance.oc.ieee.org/
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://product-compliance.oc.ieee.org/
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 


Reply via email to