In message <4c5e6457cd7911469a07260381288c286f6df...@orsmsx502.amr.corp.intel.com>, "Pettit, Ghery" <[email protected]> writes >It should be noted that the current level of notching provides an >adequate level of protection to services in the notches. This has been >shown by experience in the field.
It hasn't been demonstrated on European mains distribution systems. Such trials that have been carried out have not produced encouraging results. >And, the IEEE EMC Society believes that EMC considerations are critical >to the success of PLC and Smartgrid technologies. > Does Smartgrid require more bandwidth than is available in the existing Utilities band , roughly 90 to 150 kHz? There seems to be no need to send high-speed data over the distribution network; there are plenty of existing and future ways to do that. -- This is my travelling signature, adding no superfluous mass. John M Woodgate - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc Graphics (in well-used formats), large files, etc. can be posted to that URL. Website: http://www.ieee-pses.org/ Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas <[email protected]> Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher: <[email protected]> David Heald: <[email protected]>

