In message 
<4c5e6457cd7911469a07260381288c286f6df...@orsmsx502.amr.corp.intel.com>, 
"Pettit, Ghery" <[email protected]> writes
>It should be noted that the current level of notching provides an 
>adequate level of protection to services in the notches.  This has been 
>shown by experience in the field. 

It hasn't been demonstrated on European mains distribution systems. Such 
trials that have been carried out have not produced encouraging results.

>And, the IEEE EMC Society believes that EMC considerations are critical 
>to the success of PLC and Smartgrid technologies. 

>
Does Smartgrid require more bandwidth than is available in the existing 
Utilities band , roughly 90 to 150 kHz? There seems to be no need to 
send high-speed data over the distribution network; there are plenty of 
existing and future ways to do that.
-- 
This is my travelling signature, adding no superfluous mass.
John M Woodgate

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to