In message <[email protected]>, dated Wed, 31
Oct 2012, Michael Derby <[email protected]> writes:
I was chatting with a power supply manufacturer who told me he had
worked hard to design his power supply and get it through all the
necessary regulations. When complete, he sent the design and
instructions out to the manufacturing company.
After many of them had been made and sold, he realised the components
in the power supply were all cheaper imitations of the components he
had instructed the manufacturer to use.
This is VERY widespread. It's astonishing how many companies don't have
an effective 'Goods Inwards Inspection' function, to use an archaic but
very explicit term.
--
OOO - Own Opinions Only. See www.jmwa.demon.co.uk
The longer it takes to make a point, the more obtuse it proves to be.
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK
-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc discussion
list. To post a message to the list, send your e-mail to <[email protected]>
All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html
Attachments are not permitted but the IEEE PSES Online Communities site at
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used
formats), large files, etc.
Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html
For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>
For policy questions, send mail to:
Jim Bacher: <[email protected]>
David Heald: <[email protected]>