Hi Everyone,

I was hoping someone could shed some light on configuring static LACP ports in 
a C2 stacked environment. Basically I have two C2 (C2G124-48)switches 
configured in a stack however based upon the information I have read the C2's 
are only capable of 6 LAG ports(lag.0.1-0.6) in total. I would have assumed 
that with two switches in a stack this would have doubled to twelve ports as 
when you halve it, 3 lag ports per switch isn't many?

Any assistance would be much appreciated.

Regards,
Stuart McRobert
ICT Infrastructure and Systems Support - Manager
Department of Sport and Recreation
[Description: Telephone:]| (08) 9492 9851
[Description: Facsimile:]| (08) 9492 9711
[Description: email:]| [email protected]
www.dsr.wa.gov.au<http://www.dsr.wa.gov.au/>

246 Vincent Street, LEEDERVILLE, W.A, 6007
PO BOX 329, LEEDERVILLE, W.A, 6903

[http://www.dsr.wa.gov.au/assets/images/Email%20signature/Email%20Signature%20YOTV+10.jpg]

---
To unsubscribe from enterasys, send email to [email protected] with the body: 
unsubscribe enterasys [email protected]

<<inline: image001.gif>>

<<inline: image002.gif>>

<<inline: image003.gif>>

Reply via email to