Hi Everyone, I was hoping someone could shed some light on configuring static LACP ports in a C2 stacked environment. Basically I have two C2 (C2G124-48)switches configured in a stack however based upon the information I have read the C2's are only capable of 6 LAG ports(lag.0.1-0.6) in total. I would have assumed that with two switches in a stack this would have doubled to twelve ports as when you halve it, 3 lag ports per switch isn't many?
Any assistance would be much appreciated. Regards, Stuart McRobert ICT Infrastructure and Systems Support - Manager Department of Sport and Recreation [Description: Telephone:]| (08) 9492 9851 [Description: Facsimile:]| (08) 9492 9711 [Description: email:]| [email protected] www.dsr.wa.gov.au<http://www.dsr.wa.gov.au/> 246 Vincent Street, LEEDERVILLE, W.A, 6007 PO BOX 329, LEEDERVILLE, W.A, 6903 [http://www.dsr.wa.gov.au/assets/images/Email%20signature/Email%20Signature%20YOTV+10.jpg] --- To unsubscribe from enterasys, send email to [email protected] with the body: unsubscribe enterasys [email protected]
<<inline: image001.gif>>
<<inline: image002.gif>>
<<inline: image003.gif>>
