This message is from the T13 list server.

Dan,

Thanks for doing an excellent job with the document. (I also listened to
portions of the call yesterday.) 

A few minor details:

In section 4.1, item 4; Pin 11 is really activity signal, not LED signal
In section 4.1, item 6; Phy Event Counters, not Phy Counter Logs
In section 4.1, item 10; it should include IDENTIFY PACKET DEVICE too, and
also READ LOG (EXT) changes (relevant pages)

Probably it will ever be an issue, but I don't think I see the scenario in
sections 4.2.1/2 addressed in which T-13 (SATA-IO) chooses not include a
SATA-IO (T-13) proposal.

Mladen Luksic
Western Digital



-----Original Message-----
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of
[EMAIL PROTECTED]
Sent: Thursday, June 02, 2005 8:30 PM
To: [email protected]
Subject: [t13] Results of T13/SATA-IO Doc Plan Proposal Ad Hoc Call

This message is from the T13 list server.


Dear T13 Reflector Member: 

T13 held an ad hoc teleconference meeting today from 1-2pm PDT. 

The proposal was reviewed. The results of the call are reflected as change 
bars in document 
http://www.t13.org/docs2005/e05134r2-T13-SATA-IO-Documentation-Plan-Proposal
.pdf

The participants on the call were: 
Dan Colegrove Hitachi GST
Mark Overby nVidia
Brian Dees Intel
Greg Elkins QLogic
Jim Hatfield Seagate
Curtis Stevens WD
John Masiewicz WD
Steve Livaccari IBM
Ken Hirata Emulex

Best Regards,
Daniel J. Colegrove
Hitachi Global Storage Technologies

[EMAIL PROTECTED]
(702) 614-6119

Reply via email to