On Mon, 2008-02-25 at 23:08 +0100, Werner Hoch wrote: > @Peter: > As we have the tile code, do you think we need a more efficient > implementation to track down the connections at the start net point?
Probably not, although bear in mind there aren't "that" many tiles, and they span the entire legal world coordinate space. Tiles are quite large IIRC. I need to look at copying in the r-tree code from PCB for the cairo version, so I guess this optimisation can come then if desired. -- Peter Clifton Electrical Engineering Division, Engineering Department, University of Cambridge, 9, JJ Thomson Avenue, Cambridge CB3 0FA Tel: +44 (0)7729 980173 - (No signal in the lab!) _______________________________________________ geda-dev mailing list [email protected] http://www.seul.org/cgi-bin/mailman/listinfo/geda-dev
