On Mon, 2008-02-25 at 23:27 +0000, Peter Clifton wrote: > On Mon, 2008-02-25 at 23:08 +0100, Werner Hoch wrote: > > > @Peter: > > As we have the tile code, do you think we need a more efficient > > implementation to track down the connections at the start net point? > > Probably not, although bear in mind there aren't "that" many tiles, and > they span the entire legal world coordinate space. Tiles are quite large > IIRC.
Of course.. the really useful optimisation in using the tiles is that only connectible objects are listed. That would probably be a pretty big speed-up even if it were just the one large tile. -- Peter Clifton Electrical Engineering Division, Engineering Department, University of Cambridge, 9, JJ Thomson Avenue, Cambridge CB3 0FA Tel: +44 (0)7729 980173 - (No signal in the lab!) _______________________________________________ geda-dev mailing list [email protected] http://www.seul.org/cgi-bin/mailman/listinfo/geda-dev
