On Saturday 12 November 2005 08:14, Brian Harring wrote:
> Might be worth noting that as of my last sync, .53* and friends are
> *still* ~arch. 

Yep, waiting on approval from the arch teams before going stable. I'll be 
posting a notification here when it happens as well. While waiting on the
arch teams has extended the ~arch time of .53_preX, they've also exposed
regressions that wouldn't have been picked up otherwise. Other than 
documentation concerns, they seem happy with .53 as it stands and I really 
don't want to jeopardize (that's a weird lookin' word) that.

How's this for a compromise? Release the current 2.0.53 into stable so that 
2.0.51.22-r3 can be dropped out of the picture altogether. Then release a 
2.0.53.1 into ~arch with the lib handling fix so that we can get some 
guaranteed testing time of the patch. In a table:

2.0.53       arch
2.0.53_p1    ~arch
2.0.54_pre1  package.mask

After a couple of weeks, move 2.0.53_p1 to stable and drop 2.0.53.

--
Jason Stubbs
-- 
[email protected] mailing list

Reply via email to