Gerhard Postpischil wrote:
Edward Jaffe wrote:
The first several pages would have to explain the pipeline design and the delays that can occur. After that, specific instruction timings would have to assume the pipeline is flowing freely.

Management doesn't care about individual instruction timings, but the overall throughput and response time.

An instruction timings book is not intended for use by management.

--
Edward E Jaffe
Phoenix Software International, Inc
5200 W Century Blvd, Suite 800
Los Angeles, CA 90045
310-338-0400 x318
[EMAIL PROTECTED]
http://www.phoenixsoftware.com/

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to