On Sat, 25 Jul 2009, Roy Hewitt wrote:

> > 
> > Do I need to use a more powerful signon than SYSPROG? I don't see any
> > power type ICONs on the HMC or when I go into Single Object
> > Operations.
> > 
> > --
> > John McKown 
> 
> John,
> 
> When you say power off/on are you talking about removing/restoring the
> mains supply to the box?  then I think you will probably need to use
> SERVICE signon from the SE.  I don't think you can fully power-on from
> any other id, as it requires the machine to be in "service" mode, and
> that can only be done from SERVICE..  see z9BC install manual.
> 
> 
> Cheers
> 
> Roy
> 

Thanks - we will be powering down the entire building so that electrical
maintenance can do a complete check out of everything. So you are likely 
correct about that. I'll check out that book.

-- 
Trying to write with a pencil that is dull is pointless.

Maranatha!
John McKown

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to